This Old House Hour — Season 46

The team explored a weathered brick cottage nestled in a charming part of East Nashville, Tennessee, before heading to a performance at a nearby music venue.

A charming brick cottage, dating from the nineteen twenties, was carefully lifted from its original foundation and relocated to a spot within the property's garden. The architect then outlined the complexities inherent in such a significant…

Walls, constructed off-site, are positioned; the house is then carefully settled onto its newly laid foundation. A structural engineer addresses an issue encountered at the location. And, of course, there’s Nashville’s renowned hot chicken.

A visit to the Grand Ole Opry site involved initial framing work at the project house, followed by the unveiling of HVAC plans. Roof penetrations for plumbing were then sealed and covered, and a frame for a pocket door was installed.

The process began with a visit to a factory where siding was crafted from rice hulls, followed by its installation on the project house. Simultaneously, interior brickwork received necessary repairs.

Country music singer Vince Gill presents a curated view of his preferred locations in Nashville, Tennessee, where kitchen island legs are crafted from reclaimed cedar posts and the exterior paint palette is thoughtfully chosen.

A secure shelter is being built within the basement; a composite deck is under construction; the landscaping design is now finalized; and preparations for tornado safety are being maintained.

The restoration of the 1920s brick cottage is complete. A tour reveals a refreshed interior and a newly landscaped front yard, and with the work finished, the site for the next undertaking is now known.

Zack has returned. The team travels to New Jersey for a project with builder Zack Dettmore, and homeowners Peter and Kay, whose home is a charming 1930s colonial. Kevin O'Connor and Peter begin by surveying the first floor, planning the det…

The journey to Switzerland offered a firsthand look at the production of the project’s house wrap, alongside discussions regarding key objectives for the design plan and the implementation of a comprehensive rainwater management system.

The work progressed with a focus on the new addition: first, the careful framing of its walls; then, a necessary resolution to a significant plumbing problem within the kitchen; and finally, the installation of specialized hardware intended…

The interplay of vapor and condensation, a visit to the James Rose Center, and the task of designing a discreet ventilation system for the primary bedroom wall – these were the considerations at hand.

## The Craft of Wood Fiber Insulation and Soundproofing a Room Wood fiber insulation begins with the careful processing of wood, typically from sustainably harvested sources. Small wood strands are cooked under high pressure and temperat…

A frameless shower enclosure was selected; the kitchen floor was installed; and a bespoke water feature was fitted for the backyard patio.

As the construction neared its end, the entire crew gathered to lend a hand: installing the boiler, setting the pantry tiles.

The restoration of the 1930s colonial revival is nearing completion. A tour of the house reveals a newly added rear extension and patio, complete with a water feature. Plans for the subsequent undertaking are now known.
In Wesford, Massachusetts, a team is gathered to undertake the restoration of a colonial dwelling, one scarred by a past fire.
The project encompassed several key elements: the restoration of the roof to faithfully reflect the original structure, addressing insulation deficiencies within the existing walls, and the construction of a garage space within the current …
The undertaking of crafting an ideal heating, ventilation, and air conditioning system, alongside an exploration of fire's propagation within balloon-framed dwellings.
The grand staircase was being brought back to its former glory; a trip to the orchard offered a welcome respite; and a roof hatch was fitted to the widow's walk.
The work underway included the installation of a new septic system, restoration of the staircase damaged by the fire, and initial plumbing work.
The project involved installing new siding, employing stone to better integrate the addition with the existing house, and a visit to a trade school in Switzerland.
The old chandelier is undergoing rewiring. Preparations for a backyard solar installation are in their early phases. Fiberglass gutters are currently being installed.
The days were spent on practical tasks: painting a room, replacing tiles on the second-floor fireplace, and mending cracks in the plaster. A trip was also made to Williamson College of the Trades, to learn of the successes of its recent alu…
I'm coordinating with the team to assess the remaining tasks. We're currently installing pendant lights, including a rewired antique chandelier, and the solar fixtures are being completed in the backyard.
As the renovation of the Westford colonial, scarred by fire, progresses, the crew offers a tour of the restored interior.