This Old House Hour — Season 45
In Lexington, Massachusetts, a team embarks on a project to adapt a 1960s mid-century modern home for a family. Their son lives with Duchenne Muscular Dystrophy, and the undertaking aims to create a more accessible living environment. The c…
The space has been cleared, and construction is underway. Plans for the updated design and compliance with current energy standards are being outlined.
The design incorporates accessible features from the very start of construction. A new mechanical room is linked to the existing structure by a tunnel built of solid block, and the heating, ventilation, and air conditioning ducts are concea…
The existing lally column impeded the flow of the planned open floor plan. To resolve this, the column was removed, and the ridge beam replaced with a set of three engineered beams. A preliminary rendering of the redesigned space is present…
A threshold, unmarked by steps, leads onto the patio. The concept of geothermal energy is presented, followed by the undertaking of well construction.
The house now presents its complete facade. Progress continues on the geothermal system, with connections established to the interior. Framing is now blocked out, and existing electrical outlets are being replaced and rewired.
Restoring aged brickwork, constructing a ramp for accessibility, exploring the features of a contemporary home designed for universal access, and installing exterior trim.
A stroll across the roof exposes its varied slopes; a built-in gutter system is then put in place; interior rough-in work commences; and energy-efficient windows are installed.
The renovation progresses in stages, designed for optimal efficiency. First, the rear foundation receives its stucco finish; then comes the selection of kitchen cabinetry, followed by the installation of siding. Finally, the back patio is a…
Construction progresses with the laying of the slab-on-grade foundation. Plans are being considered for accessible audio-visual systems. Preparations are underway for a curbless shower installation, alongside the planned installation of a d…
The copper bonding is fitted prior to the installation of the therapy pool via crane. Tile choices are then unveiled, followed by the completion of the integrated entrance ramp with a snow-melt system and a final concrete layer. Finally, th…
The project progressed with the construction of the elevator cab, followed by a creative repurposing of leftover flooring into a contemporary accent for the kitchen island. Simultaneously, attention was given to accessible technology, expl…
The initial work on the geothermal systems commenced, followed by the installation of in-wall lighting to brighten the entrance ramp. An offset P-trap was installed, and a visit to a glass-blowing studio took place. Subsequently, the instal…
The garden's foundation is laid with carefully chosen screen trees and fragrant rose bushes. Nearby, the children contribute to a vibrant painting project, their small hands adding color to the scene. Inside, the homeowners engage in a seri…
Geothermal energy is gaining prominence; new kitchen appliances are now operational; and the latest HERS rating has been released.
The meticulously completed renovation of the 1960s mid-century modern home now comfortably houses a family of five, including a child with Duchenne muscular dystrophy. The design team will revisit the residence with the family to ensure a s…
The team traveled to New Jersey for their second undertaking of the year: a 1897 Victorian house in Glen Ridge, being restored for a family spanning generations. The homeowners offered a tour, detailing their vision for how the renovated ro…
Construction at the historic site has revealed a remarkable find: fifteen-year-old wine bottles embedded within the walls. Work continues with the demolition of an old chimney and the reframing of the roof. The architect offers insight into…
The extent of termite damage has necessitated significant alterations to the building's structure. Consequently, new footings are now required in the basement. A tour is given of the historic community garden. A fifteen-year-old student rec…
The work progressed with a focus on foundational improvements: helical piers were installed to support the new porch structure. Meanwhile, preparations were made for the installation of the new windows. And diligent measures were taken to …
The newly installed windows, devoid of flanges, are sealed against water and air. Preparations are underway for the installation of in-ceiling speakers. A visit is made to the Empire State Building. Porch decking is being fitted to reduce m…
Achieving exceptional air tightness is enhanced through the use of vapor barrier electrical boxes. The homeowner commissions a bespoke sidelight crafted from leaded glass. A range of weather-resistant barriers is considered. Drip edge flash…
Constructed in a workshop and assembled on location, the staircase undergoes a tour of its creation. Meanwhile, the homeowner lays a new brick walkway. Discussions encompass wood fiber insulation and the workings of the new HRV system, whil…
The blower door test assesses a home's air tightness; baseboard trim receives a rounded detail; conversation turns to the borough’s work in preserving its tree-lined avenues; a prefabricated tile niche is installed; and interior trim is pre…
The project list included crafting a bespoke bench for the mudroom from salvaged timber, achieving a custom paint finish in the main bathroom, tending to the spring landscaping, and installing crown molding above the kitchen cabinets alongs…
The restoration of the 1887 Victorian is finished. The builder now installs the custom lead glass sidelight, and the homeowners receive a tour of their newly revitalized home.